# Building Permission in Telangana by Plot Size: BuildNow (Formerly TS-bPASS)

Source: https://hyderabadhomeloans.com/2026/10/17/building-permission-telangana-buildnow-ts-bpass/ · Updated 17 Oct 2026

**Quick answer:** Building permissions in Telangana now go through **BuildNow**, which replaced TS-bPASS (TG-bPASS closed on 15 December 2025). Homes on plots up to 75 sq yd, and on plots up to 500 sq m (about 598 sq yd) with height up to 10 m, have a 15-day timeline. Larger or taller buildings take 21 days.

*By Vijay Arjun V (B.Pharm, PGDM): authorised LIC HFL DSA since 2002 and DME (Direct Marketing Executive) appointed by LIC HFL. Rules checked on the BuildNow portal and loan terms on lichousing.com on 17 October 2026.*

## What replaced TS-bPASS?

BuildNow, launched by the state government in March 2025 ([Deccan Chronicle, 21 March 2025](https://deccanchronicle.com/southern-states/telangana/revanth-launches-new-building-permit-system-1868126)). The [BuildNow portal](https://buildnow.telangana.gov.in/) says building and layout applications in **GHMC, HMDA and DTCP limits** are now processed through it, and that the TG-bPASS portal closed permanently after 15 December 2025.

The categories people still call “instant registration” and “instant approval” carry over. What changed is the system, not your need for a valid permission.

## Which permission does your plot need?

| Residential plot | Category | BuildNow timeline |
| --- | --- | --- |
| Up to 75 sq yd (63 sq m) | Instant registration | 15 days |
| Up to 500 sq m (about 598 sq yd), height up to 10 m | Instant approval (self-certified) | 15 days |
| Above 500 sq m or taller than 10 m, and all non-residential buildings | Single window | 21 days |

Source: [BuildNow timelines](https://buildnow.telangana.gov.in/timelines) and [checklist](https://buildnow.telangana.gov.in/checklist), 17 October 2026. Square-yard figures are our conversions (1 sq m = 1.196 sq yd).

### What common Hyderabad plot sizes fall under

| Plot | In sq m | Category (height up to 10 m) |
| --- | --- | --- |
| 75 sq yd | 63 | Instant registration |
| 150 sq yd | 125 | Instant approval |
| 200 sq yd | 167 | Instant approval |
| 300 sq yd | 251 | Instant approval |
| 600 sq yd | 502 | Single window: just over the 500 sq m limit |

## Do you need an occupancy certificate?

| Residential building | Occupancy certificate (OC) |
| --- | --- |
| Plot up to 200 sq m (about 239 sq yd) and height up to 7 m | Not required |
| Plot above 200 sq m up to 500 sq m, height above 7 m up to 10 m | Issued instantly |
| Plot above 500 sq m (height up to 10 m) | 21 days |

Source: BuildNow timelines. If your building doesn’t fit a row exactly, for example a small plot built above 7 m, check with your architect before you start.

## Which documents does BuildNow ask for?

For instant registration and instant approval, the checklist asks for a front photograph of the site and your ownership documents (sale deed and link documents). Depending on your plot, it may also ask for:

- the latest property tax receipt, or vacant land tax receipts for the last 3 years
- the layout approval, if the plot is in an approved layout
- for an open plot or an unapproved layout, an ownership or link document registered before 26 August 2020
- site photographs, if work has already started
- a market value certificate, if registration data is not available
- the BRS approval, if the building was regularised under BRS

Check that your layout is approved or regularised before you apply: see [HMDA and DTCP plot rules](https://hyderabadhomeloans.com/2026/09/29/hmda-dtcp-plot-loan-hyderabad/) and [loans on LRS plots](https://hyderabadhomeloans.com/2026/09/29/lrs-plot-home-loan-telangana/). Plots near lakes need an FTL check too: [FTL and buffer zones](https://hyderabadhomeloans.com/2024/09/28/ftl-and-buffer-zones-protecting-our-water-bodies/).

## How long is a building permission valid?

Three years for a non-high-rise building and five years for a high-rise, according to BuildNow. Plan the work and the funding together: LIC HFL’s [composite (plot + construction) loan](https://hyderabadhomeloans.com/plot-and-construction-loan-hyderabad/) also expects the house to be finished within 3 years of buying the plot.

## How do you check a permission before you buy?

1. Ask the seller or builder for the permission number and the sanctioned plan, in writing.
2. Look up the number in BuildNow’s [citizen search](https://app.buildnow.telangana.gov.in/citizen-search).
3. Match the floors, height and setbacks on site against the sanctioned plan.
4. Check that the plot and survey number match the sale deed.
5. For a finished building that needs one, ask for the occupancy certificate. See the [possession checklist](https://hyderabadhomeloans.com/2026/10/09/flat-possession-checklist-hyderabad/).

## How does building permission affect your loan?

- A [home construction loan](https://hyderabadhomeloans.com/home-construction-loan-hyderabad/) needs the approved plan and a cost estimate from your engineer or architect. LIC HFL rates start at **7.15%** for salaried borrowers with CIBIL 825+ (17 October 2026).
- Buying the plot as well? The composite loan is priced on the plot loan card, from 7.35%.
- LIC HFL funds up to 90% of the cost for loans up to ₹30 lakh, 80% for ₹30–75 lakh and 75% above that.
- Build exactly to the plan. Extra floors or reduced setbacks can stop a loan: read [home loans on properties with deviations](https://hyderabadhomeloans.com/2026/09/29/deviation-property-home-loan-hyderabad/).
- Budget the build first: [construction cost per sq ft in Hyderabad](https://hyderabadhomeloans.com/2026/10/16/construction-cost-per-sq-ft-hyderabad/).

[WhatsApp your plot details](https://wa.me/918886249998?text=Hi%2C%20I%20plan%20to%20build%20on%20my%20plot.%20Location%2C%20plot%20size%20%28sq%20yd%29%2C%20floors%20planned%20and%20whether%20permission%20is%20approved%3A%20)

[Check your eligibility](https://hyderabadhomeloans.com/free-eligibility-check/)

## Frequently asked questions

### Is TS-bPASS still working?

No. The BuildNow portal asked applicants to submit pending TG-bPASS applications by 15 December 2025, after which TG-bPASS closed. New applications go through BuildNow.

### Do I need permission for a house on a 75 sq yd plot?

Yes, through instant registration on BuildNow. The checklist asks for a site photograph and your ownership documents.

### Does BuildNow cover gram panchayat areas?

BuildNow lists applications in GHMC, HMDA and DTCP limits. Whatever the area, first make sure the layout itself is approved or regularised; lenders check this.

### Can I get a loan to add a floor?

Yes, with a permission that covers the new floor. See the [home extension loan](https://hyderabadhomeloans.com/home-extension-loan-hyderabad/).

*Sources: [BuildNow portal](https://buildnow.telangana.gov.in/) (notices, [timelines](https://buildnow.telangana.gov.in/timelines), [checklist](https://buildnow.telangana.gov.in/checklist)), checked 17 October 2026; [Deccan Chronicle](https://deccanchronicle.com/southern-states/telangana/revanth-launches-new-building-permit-system-1868126) (21 March 2025); LIC HFL loan terms on lichousing.com, checked 17 October 2026.*